logo
A powerful architecture & Construction theme. Construct your website in the perfect Ratio.
Alienum phaedrum torquatos nec eu, vis detraxit periculis ex, nihil expetendis in mei. Mei an pericula

Parkland Health and Hospital System Parkland Moody Outpatient Clinic

Dallas, Texas

PHOTO CREDIT: © Tom Harris

Services Provided:

Structural Engineering

Construction Cost:

$154 million

Completion Date: 

2021

Project Size: 

525,000 SF

Sustainability: 

LEED Gold

Awards: 

AIA 2023 Healthcare Design Award

Located just east of Parkland’s main campus and adjacent to the Dallas Area Rapid Transit commuter rail station, this six-story clinic and office building houses offices, exam rooms, MRI testing spaces, and the Moody Center for Breast Health. The cast-in-place concrete structure uses ground-level transfer girders to eliminate columns and create an unobstructed-view auditorium. The project also consolidated previously scattered administrative offices onto the upper levels to centralize operations. Exposed round structural columns and polished concrete corridors define the interior design, while a covered walkway connects the Moody Clinic to the DART station and nearby main campus.